The building has eleven floors wih five floors used for office application. The office floors are designed with air water system with chilled ceilings in the internal zones and active chilled beams in the perimeter zones.
TROX have participated mock up test set up in Hong Kong amongst other manufacturers. During the mock up test, the complete data have been recorded and results were compared amongst different manufacturers.TROX have eventually won the project based on the test result.
The contract includes chilled ceilings supplied from TROX China and active chilled beams from TROX Malaysia. Performance tests for both chiled ceiling and active chilled beam were carried out in TROX China'EN compliant testing laboratory and witnessed by end user, consultants, main contractor and MEP contractor. Supplies have been completed as of May and are being installed. The system commissioning is due to be conducted in July and whole project to be completed at end of 2013
Share page
Recommend this page
Recommend this page by sending a link by mail.
Share page
Thank you for your recommendation!
Your recommendation has been sent and should arrive shortly.
Contact
We are here for you
Please specify your message and type of request.
Tel.: +60 6 678 8188 | Fax: +60 6 678 8288 (388)
Contact
Thank you for your message!
Your message is send and will be processed shortly.
Our department for Service-Requests will contact you asap.
For general question regarding products or services you can also call:
Tel.: +60 6 678 8188 | Fax: +60 6 678 8288 (388)
Contact
We are here for you
Please specify your message and type of request.
Tel.: +60 6 678 8188 | Fax: +60 6 678 8288 (388)
Contact
Thank you for your message!
Your message is send and will be processed shortly.
Our department for Service-Requests will contact you asap.
For general question regarding products or services you can also call:
Tel.: +60 6 678 8188 | Fax: +60 6 678 8288 (388)